The 4E rule of engineering
Every project we design follows Safety, Economy, Aesthetics and Universality, in that order — a measurable roadmap instead of routine practice.
Horizontal directional drilling (HDD), auger boring and pipe jacking, trenchless pipe bursting and smart undergrounding consultancy. For diameters from 2 mm to 2000 mm, serving all of Türkiye from our Istanbul and Izmir offices.
We install natural gas, potable water, sewer, power and fibre-optic lines underground. Locating and electronic targeting systems track the bore path with high precision.
The method for installing large-diameter steel pipes underground. Pipe jacking, auger boring and microtunnelling save both cost and time.
We replace old lines with new pipes without excavation — and, if you wish, in larger diameters.
More than 20 years of experience in infrastructure planning. Innovative underground solutions bring projects to life that once seemed impossible.

Over 20 yearsInternationalField experience
We bring different engineering disciplines together under one roof, drawing on years of construction and infrastructure experience — and we remove unnecessary capacity and extra cost to build partnerships that last.
Deltek is a trenchless contractor providing horizontal drilling, horizontal directional drilling (HDD), pipe jacking, auger boring and microtunnelling and trenchless pipe bursting across Türkiye from its Istanbul and Izmir offices. We install natural gas, water, sewer, power and fibre-optic lines under rivers, motorways, railways and city streets without open-cut excavation.
Every project we design follows Safety, Economy, Aesthetics and Universality, in that order — a measurable roadmap instead of routine practice.
Our engineers introduced “smart undergrounding” to the literature. For every line they work out the most reasonable, most economical solution before the work begins.
Up to 250 tonnes in horizontal directional drilling and 800 tonnes in auger boring. We prepare the feasibility report for machine and crew selection free of charge.
Our technical pages explain horizontal drilling, trenchless boring and horizontal directional drilling; HDD rigs, drill rods, steering heads and reamers, locating systems and drilling fluid. We recommend reading them before choosing a trenchless method.

How a pipeline is taken under a river by HDD: investigation, profile design, entry and exit angles, depth of cover, frac-out risk, reaming and pullback.

HDD or open-cut trenching? Direct and indirect costs of both methods, duration, risk and a decision table showing which is more economical where.

Why a geotechnical investigation is essential for HDD: how drill head, reamer, drilling fluid and risk change in clay, sand, gravel and rock.
Get in touch with any questions.
0850 888 3585